  • Showing MCC Centre

    First IBA Processing Facility in Australia

    Design, build, install and commission bespoke control and automation systems for Australia’s first Incinerator Bottom Ash (IBA) Processing Facility for a wider Waste-to-Energy development in Western Australia.

  • MCC Panel On Stage

    New MCC Panels for Waste-Recycling Plant

    Following a recent acquisition our client needed two new MCCs panel to upgrade the facility picking lines and a fluid tank control system optimisation at their Midlands Waste-Water Recycling plant.

  • Shows image of VSD Hire Drive loaded for delivery

    Emergency 315kW VSD Hire Drive Saves Christmas

    Deliver, install and commission a replacement drive. Only 4 hours from arrival to fully functioning. Ensured a seamless integration with the existing system, restored pumps to full capacity and safeguarded potential flooding.

  • Showing Dunball Sluice Gate Somerset

    Somerset Sluice Gate Gets a New Control System

    Design, build and install a new control system and re-cable following a refurbishment. Upgrade gives effective operational functionality for decades to come. Improves performance and mitigates the risk of flooding.

  • systems installation, inverter, drive solution

    Ceramics Production has a Modern Makeover

    When a Midlands based ceramics manufacturer found it was becoming increasingly less efficient and its productivity seriously reduced, it reached out to Drive Solutions Centre partner Total Automated Solutions to provide a solution.

  • showing repaired cabling

    Reviving Efficiency for Sewage Treatment

    We restored the Megawashers and Spiropress units to automatic mode by commissioning instruments and infrastructure. This saves the client significant maintenance time and energy costs.

  • water treatment, SCADA package

    Abu Dhabi Power and Desalination Plant

    Contracted to design, install and commission a SCADA package to monitor and archive water quality parameters on the Umm Al Nar power and desalination plant located on Sas Al Nakiel Island, Abu Dhabi.

  • control panel being installed

    Critical Upgrade - Landfill Site Ready for the Future

    Our proven partnership and track record secured this critical upgrade. We delivered a fast, reliable, accurate control system—all without interrupting the client's ongoing operations.

  • Image of bottom ash facility

    New MCC for ECS & Extension Upgrade

    Part of a wider upgrade, we designed and installed a four-cabinet MCC system and cabling to support ECS extensions—a significant undertaking for the project.

  • reduce energy, water pump

    Converting River Flow into Renewable Energy

    To lower energy costs for a private home, we designed a control system for Spaans Babcock, converting river flow into electricity for domestic use and grid export.

  • Water treatment, systems update

    Renewable Energy System for Hong Kong

    Facing environmental challenges, a Hong Kong water authority tasked us with installing a sustainable, fully automated renewable energy system integrated into their existing site infrastructure.

  • Monitor for Water Pressure in Hotel Operations

    Hotel Secures Optimal Water Pressure

    Installation of a PLC, variable speed drives and touch screen display from Mitsubishi Electric to ensure the correct water pressure without impacting hotel’s daily operations.

  • Imae shows batch bags stacking station, ready for distribution

    Minimising Lost, Maximising Safety

    New Control and Automation solution to expedited batching process and ensure the secure stacking of goods for distribution, with added valve panel for extra safety.

  • Landfill Site Telemtry in Snow

    Telemetry System for a Landfill Site

    Design, supply and install a GSM, Text-based Telemetry System on a Landfill Site. Allowing for providing status messages, critical alarms and remote control on five remote pumping stations throughout the site.

  • Control and Scada System

    Scottish Waste Water Treatment in Safe Hands

    Following Total Automated Solutions being contracted to configure the Control and SCADA system on the new installation of a Lamella system at a Water Treatment Works in Scotland.