Delivering a New Control Panel for an Extension and ECS Upgrade For a Waste Recycling Company

Successfully designed, installed and commissioned a a four-cabinet control panel with added cabling and switch room works, thus delivering a robust, flexible solution integrated with existing infrastructure for future expansion at a waste recycling incinerator.

Next
Next

A Site with a Future - Supporting the Changes of a Former Landfill Site